summaryrefslogtreecommitdiffstats
path: root/meta/recipes-extended/msmtp
diff options
context:
space:
mode:
authorMingli Yu <Mingli.Yu@windriver.com>2019-07-15 16:56:18 +0800
committerRichard Purdie <richard.purdie@linuxfoundation.org>2019-07-16 13:53:16 +0100
commit8af95f0ee7eb8bd97b08aba8596aa6930ea13e82 (patch)
tree72c38ca86adca7b7120299a7ec350ec94855db19 /meta/recipes-extended/msmtp
parent2c6db4d8e790304711c8169828605b009f70ac91 (diff)
downloadpoky-8af95f0ee7eb8bd97b08aba8596aa6930ea13e82.tar.gz
mdadm: fix ptest hang
Before commit[80d17497b7 mdadm: improve the run-ptest], the mdadm ptest just run some tests without "--keep-going" option. After the option added in commit 80d17497b7, all test cases have chance to be called. But the logic in mdadm upstream commit [e2a8e9d tests: wait for complete rebuild in integrity checks] will make the test enter infinite loop especially in qemu env as commit e2a8e9d update the logic from "check wait" to "check state 'U*'" for testcase tests/01r5integ and tests/01raid6integ. Considering all other cases still use "check wait" logic, so revert e2a8e9d to make tests/01r5integ and tests/01raid6integ also use "check wait" logic to avoid the infinite loop. [YOCTO #13368] (From OE-Core rev: b507793f4adde0c60588b06520d7d0b70acfd82a) Signed-off-by: Mingli Yu <Mingli.Yu@windriver.com> Signed-off-by: Richard Purdie <richard.purdie@linuxfoundation.org>
Diffstat (limited to 'meta/recipes-extended/msmtp')
0 files changed, 0 insertions, 0 deletions